Fire detection and fire alarm systems CE Certification
Summary: Fire detection and fire alarm systems CE Test、CE Certification requirements
EU Regulation for Fire detection and fire alarm systems CE
Construction products (CPR) Regulation (EU) No 305/2011
Remark: if it is with power, EMC 2014/35/EU shall be complied.
Fire detection and fire alarm systems CE standards
EN 54-2:1997/A1:2006 Fire detection and fire alarm systems - Part 2: Control and indicating equipment |
EN 54-3:2001/A2:2006 Fire detection and fire alarm systems - Part 3: Fire alarm devices – Sounders |
EN 54-4:1997/A2:2006 Fire detection and fire alarm systems - Part 4: Power supply equipment |
EN 54-7:2000/A2:2006 Fire detection and fire alarm systems - Part 7: Smoke detectors - Point detectors using scattered light, transmitted light or ionization |
EN 54-10:2002/A1:2005 Fire detection and fire alarm systems - Part 10: Flame detectors - Point detectors |
EN 54-11:2001/A1:2005 Fire detection and fire alarm systems - Part 11: Manual call points |
EN 54-12:2015 Fire detection and fire alarm systems - Part 12: Smoke detectors - Line detectors using an optical beam |
EN 54-17:2005/AC:2007 Fire detection and fire alarm systems - Part 17: Short-circuit isolators |
EN 54-18:2005/AC:2007 Fire detection and fire alarm systems - Part 18: Input/output devices |
EN 54-20:2006/AC:2008 Fire detection and fire alarm systems - Part 20: Aspirating smoke detectors |
EN 54-21:2006 Fire detection and fire alarm systems - Part 21: Alarm transmission and fault warning routing equipment |
EN 54-23:2010 Fire detection and fire alarm systems - Part 23: Fire alarm devices - Visual alarm devices |
EN 54-24:2008 Fire detection and fire alarm systems - Part 24: Components of voice alarm systems – Loudspeakers |
EN 54-25:2008/AC:2012 Fire detection and fire alarm systems - Part 25: Components using radio links |
Fire detection and fire alarm systems CE Test Item:
l Operational reliability
l Performance parameters under fire conditions
l Durability of operational reliability; temperature resistance
l Durability of operational reliability; vibration resistance
l Durability of operational reliability; humidity resistance
l Durability of operational reliability; corrosion resistance
Fire detection and fire alarm systems CE Certification system
l System 1
Factory's responsibilities:
1)Factory production control(FPC)
2)The factory carries out sample test according to the test plan
Notified body responsibilities:
1)ITT
2)Factory and factory production control inspection
3)FPC Continuous/periodic supervision, evaluation and approval
CE mark-& CE nameplate
Construction products shall be marked with CE, and then can export to EU market,each certification standard for CPR list the detailed requirement for the CE mark and CE label, Professional certification engineer of Shanghai GOM will help and guide the Chinese factory to prepare and design the CE nameplate,to meet European market requirements.
Declaration of Performance for CPR
After the implementation of CPR regulations,EU require the construction products must provide DOP when export to EU,and CPR Regulation (EU) No 305/2011 detailed list the content and requirement of DOP,professional certification engineer of Shanghai GOM will help and guide the Chinese factory to prepare this document,this will help manufacturers to smoothly enter the EU market.
About us
Shanghai GOM Testing and Technical Co., Ltd.(GOM) is famous for its global service in testing and certification business. We focus on the certification, testing, inspection and standard training for products approaching markets including Europe, America, and Russia etc. We are authorized by several European Notified Body and Russian Official Certification Authorization to directly accept application from manufacturers or trading company, to help their products comply with requirements of international regulation and standard, to help enterprises eliminate trade and technology barrier, to improve competition of “Made in China”